V. Frequently Asked Questions (FAQ)
Q1: What is the typical factory lead time for a 200 kVA distribution transformer?
For standard 10kV/0.4kV 200 kVA oil-immersed transformers, our factory manufacturing lead time is typically 20 to 25 days. Since 200 kVA is a widely requested standard rating, core laminations and corrugated tanks are regularly pre-stocked to speed up production. Customized orders take approximately 30 to 40 days.
Q2: What warranty coverage and extended service plans are available for this 200 kVA transformer?
We supply a 12-month standard warranty starting from the commissioning date (or 18 months from shipment). For rural grid contracts or commercial development projects, extended warranty packages up to 5 years are available, backed by rapid technical support and spare parts availability.
Q3: How does Hengfengyou Electric offer competitive pricing for 200 kVA power transformers?
By manufacturing directly and eliminating agent commissions, we pass volume material procurement savings straight to buyers. Automated coil winding machines and robotic tank welding systems ensure precise quality control while keeping production overhead low.
Q4: How do you calculate the primary and secondary rated currents for a 200 kVA 10kV/0.4kV transformer?
For a standard 10kV to 0.4kV step-down voltage transformation:
Q5: What are the primary application scenarios for a 200 kVA oil-immersed transformer?
With a low-voltage rated current around 289 Amperes, a 200 kVA transformer is ideal for small manufacturing workshops, agricultural processing hubs, rural distribution substations, commercial buildings, and localized solar power tie-ins. It is standardly equipped with a Dyn11 vector group to effectively handle unbalanced neutral load conditions up to 100%.