Hengfengyou Electric provides this customized technical solution for the delivery of two 250MVA-220kV power transformers to the Energex Hub Substation in Queensland. As critical assets for the regional grid, these units are designed for long-term stability in tropical climates. They utilize On-Load Tap Changing to manage voltage fluctuations from renewable inputs. The YNyn0+d11 vector group supports industrial loads and renewable energy off-take requirements.
| Parameter | Specification | Remarks |
| Model | SZ22-250000/220 | Three-phase, OLTC, ODAF |
| Rated Capacity | 250MVA | Continuous rating (1.3x overload capable under ODAF) |
| Voltage Ratio | 220±10×1.5% / 33kV | HV side OLTC (AS 60076 compliant) |
| Vector Group | YNyn0+d11 | Adapts to AU earthing & harmonic suppression |
| Short-Circuit Impedance | Uk=12% (HV-MV) / 14% (HV-LV) | Matches 50kA system fault levels |
| Cooling Method | ONAN/ONAF/ODAF | Natural/Forced Air/Directed Oil Forced Air |
| Insulation Level | LI950 AC395 / SI325 AC140 | Lightning/Switching Impulse withstand voltage |
| Environmental | -5°C to +45°C, C5-M Salinity | AS/NZS 60721-3-4 Tropical Coastal Standard |

Based on AS/NZS 60076 standards, our team utilizes Ansys Maxwell and JMAG simulation platforms to calculate magnetic flux distribution, leakage fields, short-circuit electrodynamic forces, and hotspot temperature rises. We use Japanese JFE 23ZDKH90 high-permeability grain-oriented silicon steel (loss ≤0.85W/kg @1.7T) with a "three-step annealing process" to minimize magnetostriction noise.
The design phase (28 days) produces comprehensive blueprints for:
Core Structure: 45° full-oblique joints with 7-step lapping. Q355ND low-alloy high-strength steel clamps are validated via ANSYS Workbench for short-circuit resistance (dynamic stress ≤215MPa).
Winding Insulation: HV windings use 0.08mm x 3-layer Nomex paper. LV windings utilize 2.0mm epoxy glass cloth boards for end insulation.
Tank Design: Bell-type structure (16mm wall thickness) with two 300mm explosion-proof valves. Validated via 1.2x design pressure sealing tests (24-hour hold).
Component Selection: German MR VACUTAP® OLTC with online oil filtration; Italian P&V 220kV OIP bushings (creepage 31mm/kV); Swiss SIBA SGA-220 gas relays with digital flow monitoring.
Material Inspection: Dual-source verification for all raw materials. Shell Diala S4 ZX-I inhibited electrical oil is used (breakdown voltage ≥70kV, moisture ≤10ppm).
Core Fabrication: Processed on German GEORG slitting lines (accuracy ±0.05mm). Stacking utilizes vacuum adsorption and laser positioning.
Winding: Performed in a Class 1000 dust-free, climate-controlled workshop. Real-time monitoring of turns (error ≤±0.1) and radial compression (≥8%).
Surface Treatment: Sa2.5 grit blasting followed by a high-spec C5-M coating system: Epoxy zinc-rich primer (80μm) + Epoxy micaceous iron oxide intermediate (120μm) + Acrylic polyurethane topcoat (80μm). Total DFT ≥280μm.
Vapor Phase Drying (VPD): A three-stage kerosene VPD process ensures insulation moisture content ≤0.3% and core moisture ≤0.1%.
All tests are witnessed by SAI Global (Australia).
Routine Tests: DC resistance, voltage ratio, vector group verification, and loss measurements (No-load loss 117.8kW vs. 120kW guarantee).
Type Tests: Temperature rise (ODAF: Winding <65K, Top oil <55K); Lightning Impulse (LI 950kV/LIC 850kV).
Special Tests: Short-circuit withstand capability (simulated 50kA/3s); Zero-sequence impedance measurement; Audible noise (73dB at 1m).
Disassembly: Bushings, radiators, and conservators are wrapped in Vapor Phase Inhibitor (VPI) paper.
Nitrogen Padding: The main tank is filled with dry nitrogen (0.02-0.04MPa) and fitted with 304 stainless steel blind plates for transit.
Monitoring: Three-dimensional impact recorders (±0.1g accuracy) and GPS tracking are installed to upload real-time status to the cloud.
Route: Qingdao, China → Brisbane, Australia (28 days sea freight) → Substation site (150km heavy-haul road transport).

Arrival Inspection: Verification of nitrogen pressure and impact recorder data (Max impact ≤32g, well within the 50g threshold).
Vacuum Filling: 24-hour vacuum hold (≤13Pa) followed by hot oil circulation and 48-hour static degassing.
Site Acceptance Testing: Compliance with AS/NZS 60076-3. Includes Frequency Response Analysis (FRA) for winding deformation and partial discharge (PD) measurements (≤100pC).
Energization: Five consecutive no-load soak tests followed by a 48-hour soak and gradual load ramp-up.
| Stage | Control Point | Standard | Verification |
| Design | Electromagnetic Review | AS/NZS 60076-1 | Tri-party Sign-off |
| Material | Silicon Steel Testing | IEC 60404-8-4 | SQA Lab Report |
| FAT | Witness Testing | AS/NZS 60076-2 | SAI Global Certificate |
| Logistics | Impact Analysis | ISO 1496-1 | Cloud Monitoring |
Bilingual Test Reports (FAT/SAT).
Operation & Maintenance Manuals (with Australian local support contacts).
Full CAD drawings (DWG/PDF).
Component OEM Certificates (MR, P&V, etc.).
Warranty: 5 years for the unit; 10 years for core components.
The 250MVA-220kV transformer solution by Hengfengyou Electric bridges high-efficiency "Made in China" manufacturing with the rigorous "Australian Standards." Through localized engineering (C5-M corrosion resistance), stringent quality oversight, and dedicated cross-border support, we ensure long-term grid reliability for Queensland’s challenging tropical environment.
WhatsApp:
+86 15853252696(Jack)
+86 135 8926 2999(MARTIN)
Tel:+86-532-87936206
Fax:+86-532-87936207
Email: hfy@hengfengyou.com
Address: Address: No.638,Zhongcheng Road, Chengyang District, Qingdao City,China
Leave a message now - get the latest industry insights, star products, and success stories of hengfengyou electric