HENGFENGYOU ELECTRIC --SMART ELECTRIC GLOBAL SERVICE PROVIDER
   

Current Position:Home page > SOLUTION > Industry Solutions > Mining&Metallurgy >

Inner Mongolia Coal Mine 110kV Transmission and Transformation Project

  • Project Type:Mining&Metallurgy
  • Project Time:
  • Project Location: Inner Mongolia
  • Solution: 110kV transmission and transformation project

The substation project of this project includes the construction of two 10MVA three-phase dual winding on load voltage regulating transformers, with a voltage level of 110kV/10kV and a capacity ratio of 100/100. Line engineering: The line starts from the 220kV substation interval and ends at the 110kV substation interval, with a total length of 29.2km. Hengfengyou Electric Group has designed and produced two 10mva on load voltage regulating transformers for this project
10mva on load voltage regulating transformer

CATEGORIES

News and information

Contact us

WhatsApp:

+86 15853252696(Jack)

+86 158 5326 5269(Alisa)

Tel:+86-532-87936206

Fax:+86-532-87936207

Email: info@hengfengyou.com

Address: 506 Huicheng Road, Chengyang District, Qingdao City, China

Leave a message now - get the latest industry insights, star products, and success stories of hengfengyou electric

Click to replace Click to replace

© 2021 Copyright By Hengfengyou Electric

xml map    |    Site map

whatsapp
(+86) 15853252696
WhatsApp Click Contact