List of transformers on double pole column of 500KVA and above transformers
| No | Name | Specifications | unit | quantity |
| 一级材料 | ||||
| 1 | Fully sealed transformer |
S11-M-500kVA10±2x2.5%/0.4 Dyn11 Uk%=4 |
||
| 2 | Crosslinked low voltage cable | YJV-0.6/1kV-1x185 | ||
| 3 | High voltage insulated conductor | JKYJ-50 | ||
| 4 | Conical cement rod | 190mm×12m | ||
| 5 | Copper core double plastic wire | BVV-450/750V-1X25 | ||
| 6 | 10KV overhead insulated conductor | JKLYJ-50 | ||
| 二级材料 | ||||
| 5 | 500KVA transformer distribution box | XLW-10 | ||
| 6 | Xlw-10 outdoor compensation box | 200kVar | ||
| 7 | 10kV porcelain bushing drop switch (domestic) | RW11,200A | ||
| 8 | Low voltage arrester | HY1.5WS-0.28/1.3 | ||
| 9 | 10kV line type arrester | 5WS-17/50,IV | ||
| 10 | 10kV porcelain insulated cross arm | SC-210 | ||
| Amp clamp | ||||
| 12 | PVC tube | φ160 | ||
| 13 | Copper lug | DT-185 | ||
| 14 | Copper lug | DT-50 | ||
| 15 | Hot dip galvanized iron components | |||
| 17 | Fireproof plugging | |||
| 18 | Grounding grid of bench substation | |||
| 19 | chassis | DP6 | ||
| 20 | Copper aluminum transition live clamp | |||
| Distribution box foundation | 2100x500x600 | |||
WhatsApp:
+86 13969788801
+86 15853252696
Tel:+86-0532-68688801
Fax:+86-0532-87038801
Email: hfy@hengfengyou.com
Address: No.638,Zhongcheng Road, Chengyang District, Qingdao City,China
Leave a message now - get the latest industry insights, star products, and success stories of hengfengyou electric