The Containerized Modular Substation (also known as a Prefabricated Container Substation or E-House) from HENGFENGYOU ELECTRIC is a heavy-duty, fully integrated power distribution system housed within a standardized ISO shipping container structure. It is specifically engineered to convert low/medium-voltage AC generated by renewable energy systems (such as solar PV farms, wind power, and battery energy storage) into high-voltage AC (10kV to 110kV) for direct power grid connection.
Designed for harsh outdoor environments and mobile operations, this all-in-one solution integrates low-voltage switchboards, power transformers, ring main units (RMU), high-voltage switchgears, auxiliary power units, and intelligent SCADA monitoring into a unified steel enclosure. It is widely deployed across oil & gas fields, mining operations, offshore drilling platforms, remote industrial parks, and emergency mobile power stations across Asia, Africa, South America, and the Middle East. Full OEM/ODM engineering customization is supported.
Implementation Standards: IEC 62271-200, IEC 60076, IEC 60364, GB/T 17467, SABS, CE, ISO9001.

| Technical Parameter | Engineering Details & Options |
| Rated Voltage Class | Primary: 10kV, 11kV, 15kV, 22kV, 33kV, 35kV up to 110kV |
| Rated Power Capacity | 500 kVA – 6300 kVA (Customizable modular expansion) |
| Rated Frequency | 50 Hz / 60 Hz |
| Container Enclosure Rating | IP54 / IP65 (Corrosion-resistant, dust-proof, storm-proof) |
| Container Shell Options | Weathering Steel (Corten A), 304/316 Stainless Steel, Hot-Dip Galvanized |
| Interior Insulation & Floor | High-flame retardant thermal insulation wall + Anti-static ESD floor rubber |
| HV & LV Switchgear | SF6 Insulated RMU, Vacuum Circuit Breakers (VCB), Air Insulated Switchgear |
| Transformer Integration | High-Efficiency Oil-Immersed Power Transformer / Dry-Type Transformer |
| Environmental Control | Industrial HVAC system, forced ventilation, automatic temperature & humidity control |
| Intelligent Monitoring | DCS control, remote telemetry (SCADA), smoke alarms, fire suppression systems |
1. Modular Plug-and-Play Design & Rapid Deployment
Completely pre-assembled, wired, and tested in the factory before dispatch, reducing on-site civil construction work and installation time by over 70%.
Built into standard ISO container dimensions, allowing convenient hoisting, transport by sea or land, and effortless site relocation.
2. Heavy-Duty Corrosion Protection & Extreme Climate Resistance
Heavy-duty steel container walls treated with anti-corrosion electrostatic spraying and weather-resistant coatings, ensuring a service life exceeding 30 years.
Fully sealed insulation layer withstands extreme temperatures ranging from -40°C to +50°C, high humidity, salt spray, and desert sandstorms.
3. Advanced Fire Safety & Smart Monitoring
Equipped with flame-retardant interior walls, automatic fire alarm/extinguishing systems, and anti-static flooring to safeguard sensitive communications and power components.
Full support for "four-remote" functions (telemetry, remote signaling, remote control, and remote adjustment) for unmanned substation operation.
To obtain an accurate technical proposal and fast factory quote within 24 hours, please provide the following details:
Primary single-line diagram (SLD) and secondary control circuit schematics.
System voltage levels (HV/LV), total transformer capacity ($\text{kVA}$/$\text{MVA}$), and frequency ($50\text{Hz}$ or $60\text{Hz}$).
Main component specifications (preferred switchgear brands, circuit breaker types, transformer type).
Cable entry/exit methods (top or bottom) and cable size requirements.
Container shell material, preferred IP rating, paint color (RAL code), and environmental conditions.
Q1: What is the standard delivery time and manufacturing lead time for containerized substations?
A: For standardized modular components or stock units, shipping can be dispatched within 7 to 30 days. For fully customized containerized substations involving complex engineering drawings, high-voltage switchgears, or special utility approvals, the standard manufacturing, assembly, and testing lead time is typically 75 to 90 days.
Q2: What warranty period does HENGFENGYOU ELECTRIC provide for containerized substations?
A: We offer a standard 1-year (12 months) warranty from the date of shipment or site commissioning. To meet long-term utility or IPP project demands, warranty extensions up to 5 years are available upon request, backed by remote technical support and fast spare-part delivery.
Q3: Are your prefabricated containerized substations certified for international power grid tenders?
A: Yes. Our production complies strictly with ISO9001 quality management systems and international standards including IEC 62271-200 and IEC 60076. Our equipment holds SABS, CE, CB, and KEMA test certificates, ensuring seamless acceptance by local power authorities worldwide.
Q4: How does a containerized substation withstand harsh outdoor environments like desert or marine sites?
A: The container enclosure features heavy-duty Corten steel or 304 stainless steel with multi-layer anti-corrosion electrostatic paint. It achieves an IP54/IP65 protection rating and is fitted with industrial HVAC climate control systems, dust-proof filters, and heavy insulation interlayers to handle salt spray, sandstorms, and extreme ambient temperatures.
Q5: Can these substations be integrated with renewable energy and energy storage systems?
A: Absolutely. Our containerized substations are specifically optimized for solar PV stations, wind power generation, and battery energy storage systems (BESS). They feature built-in smart communication gateways (SCADA/DCS) for seamless grid synchronizing, step-up transformation, and real-time power monitoring.
Q6: What on-site preparation is required before the containerized substation arrives?
A: Because the substation is fully pre-tested and modularly assembled at our factory, on-site civil works are minimal. You only need to pour a level concrete pad foundation, reserve cable trenches according to our floor plan, and connect the high/low voltage incoming and outgoing cables upon delivery.

WhatsApp:
+86 13969788801
+86 15853252696
Tel:+86-0532-68688801
Fax:+86-0532-87038801
Email: hfy@hengfengyou.com
Address: No.638,Zhongcheng Road, Chengyang District, Qingdao City,China
Leave a message now - get the latest industry insights, star products, and success stories of hengfengyou electric